Bulletin Announcement on the Construction Supervision Service for the Electrical and Mechanical Engineering of the Langzhong Urban Economic Circle Expressway Netgongshan to Dongchuan Expressway

1. Bidding conditions

The expressway network of the Kwangtung-Dongchuan Expressway (hereinafter referred to as “the project”) in the Jizhong City Economic Circle has been approved by the Yunnan Provincial Development and Reform Commission with the approval of the No. 36 Document of the Foundation for the Development of the Cloud (2014). The Yunnan Provincial Department of Transportation approved the two-phase construction drawing design of the project with Yunjiao Infrastructure [2017] No. 15 document. The project owner is the Yunnan Gongdong Expressway Construction Headquarters. The construction funds are from enterprises, local government financing and domestic commercial bank loans. The enterprises and local governments raise 35% of the total investment, the domestic commercial bank loans are 65%, and the funds have been implemented. Man-made Yunnan Gongdong Expressway Construction Command. The project has already met the conditions for tendering. It is now decided that the project's mechanical and electrical engineering construction supervision services will be subject to open tendering in the form of a post-qualification review.
2. Project overview and scope of tender
2.1 Construction site: Within Xundian County and Dongchuan District, Kunming City, Yunnan Province.
2.2 Scale of Construction: The project of the freeway network of the Suizhong urban economic circle, Netcom Mountain to Dongchuan Expressway, starts at G85, Kunming (Chongqing-Kunming), Mingming-Wubu Expressway (gongshan interchange), Jinggong Town, and Awang. The town ends at the north side of Dongchuan District. The total length of the route is 49.4 kilometers. It is built on the standard of a four-lane highway. The design speed is 80 kilometers per hour and the width of the roadbed is 24.5 meters. Asphalt concrete pavement is used for road surface. There are 4 interchanges in Gongshan, Awang, Dongchuan South and Dongchuan North respectively, another comprehensive service area, 3 toll stations, 1 maintenance work area, and 2 tunnel management offices.
2.3 Service Cycle: It is estimated that the service period of mechanical and electrical engineering supervision will be 34 months. Among them, the construction period is 10 months (calculated from the actual start date, including the construction preparation period, trial run period), the defect liability period is 24 months (calculated from the date of actual delivery); the warranty period is 5 years (from the date of actual delivery Start).
2.4 Bidding scope: The three major systems (communications with embedded communication pipelines, monitoring, and charging), and tunnel electromechanical (tunnel ventilation lighting) for the entire scope of the project during the construction preparation phase, construction phase, and acceptance and defect responsibility phase of the project , power and distribution), tunnel fire engineering, supervision and management of quality, progress, investment, environmental protection, safety, contract management, data management, etc. provide supervision services and technical consulting services from construction period to completion acceptance period (not Includes technical specifications.)
2.5 Division of Tender Bid of Mechanical and Electrical Engineering Construction Supervision Services
The project has set up a second-level supervision agency. The office of the chief supervision and management engineer is established by the project owner. The office of the local resident supervision engineer (hereafter referred to as “resident office”) is publicly tendered. The bidding is divided into 1 bid section (ie, one resident office).
Supervision
Bid Section Corresponds to Construction Lot Range Main Project Content
JDJL JD The three major systems within the scope of this project (Communication (including embedded communication pipelines), monitoring, charging), tunnel electromechanical (tunnel ventilation lighting, power supply and distribution) projects included in the scope of Yunnan Gongdong Expressway project All electromechanical systems engineering:
1. Communication system: Communication system engineering within the entire scope, including the entire communication system and communication pipeline pre-embedded (main line and branch pipe network);
2. Surveillance system: The monitoring system project within the scope of the whole line includes the monitoring of the road section, the construction of the monitoring center and the monitoring of the tunnel. The total length of the main line is 49.4 kilometers;
3. Charging System: The toll system works within the scope of the entire project, including the charging and civil engineering and toll collection and electromechanical facilities, and the toll stations throughout;
4. Tunnel ventilation lighting project: tunnel ventilation lighting project within the whole line, 12 tunnels (Dawandi tunnel, Xiangshuihe tunnel, Xinjian tunnel, Majia tunnel, Jiama tunnel, Xujiadi tunnel, Wang #1 tunnel, Awang #2 tunnel, Guhai #1 tunnel, Guhai #2 tunnel, Dudder tunnel, Wangjiabu tunnel), with a total length of approximately 37,559 meters (double width);
5. Power supply and distribution engineering: The power supply and distribution project within the scope of the whole line;
6. Tunnel fire protection project: tunnel fire protection project (including fire-retardant paint) in the whole line, 12 tunnels (Dawandi tunnel, Xiangshuihe tunnel, New house tunnel, Majia tunnel, Jiama tunnel, Xujiadi tunnel) Tunnels, Awang No. 1 Tunnel, Awang No. 2 Tunnel, Guhai No. 1 Tunnel, Guhai No. 2 Tunnel, Dudder Tunnel, and Wangjiabang Tunnel), with a total length of approximately 37,559 m (double width);
7. Technical consulting services for construction supervision services from the construction period to the completion acceptance period (excluding the preparation of technical specifications).
XF Tunnel Fire Engineering
3. Bidder qualification requirements
3.1 The business license of an effective enterprise legal person issued by the administrative department of industry and commerce shall be issued by the Ministry of Transport of highway engineering and electrical engineering special supervision qualification.
3.2 Performance requirements: In the past five years (from 2012 to now), the company has independently undertaken the construction supervision tasks for the three major systems (communications, tolls, monitoring) of the mechanical and electrical engineering of the two tender highways, tunnel ventilation, lighting, power distribution and fire protection projects. The bidder’s performance, reputation and financial status are good, and there is no record of bad behavior during the penalty period.
3.3 All affiliated companies with investment equity relations, or parent companies with direct management and managed relationships, or subsidiaries of the same parent company, or legal representatives who are the same person with two or more legal persons, according to the purchase The order of the bidding documents shall be given priority to the bidder who first purchased the bidding documents. The bidder with the above relationship may not bid on the same bidding section at the same time.
The central enterprises under the direct supervision of the State-owned Assets Supervision and Administration Agency of the State Council are not categorized as "parent companies" in this article. Their first-level subsidiaries are not treated according to the aforementioned affiliates, but the second-level subsidiaries that belong to a subsidiary are treated according to the aforementioned affiliates. .
3.4 This tender does not accept the Commonwealth bid.
3.5 Units with the following affiliations must clearly indicate their affiliation at the time of registration. If they do not expressly disclose, they shall be disqualified from bidding or be qualified to be successful if the investigation is true:
a. Affiliated companies with investment equity relations;
b. parent company with direct management and managed relationship;
c. Subsidiaries belonging to the same parent company;
d. The legal representative is two or more legal persons of the same person.
4. Evaluation method
The evaluation of the project uses a comprehensive evaluation method.
5. Acquisition of bidding documents
5.1 All bidders intending to participate in the bid are invited to do so from February 15, 2017 to February 21, 2017 (excluding legal holidays, holidays, etc.).

Solar Inverter

Solar Inverter,Centralized Inverter,Off-Grid Inverter,Grid -Connected Inverter

Fuzhou Mei Li Cheng Imp&Exp Co., Ltd , https://www.mlc-solar.com

Posted on